In this job, mineral process plant at Zacatecas, Zacatecas, we installed the water storage system.
The system installed includes a 240,278 gallon Bolted Tank for water storage, according to NFPA 22 standard.
The project was delivered complying with timeframe, quality and cost, aligned to the GANT defined and the job program.