In this project, a paper production plant located in Pesquería, Nuevo León, we installed the fire protection system.
The installed system included ESFR sprinklers at roof level and automatic sprinklers in the general office areas, in accordance with NFPA 13 standards. Additionally, UL/FM listed interior hose valve stations with 1 ½” hoses and fire department connections were installed in compliance with NFPA 14 standards. The scope also included the installation of a 2,500 GPM fire pump system, consisting of diesel and jockey pumps, in accordance with NFPA 20. Furthermore, a 120,000-gallon fire water storage tank was installed in accordance with NFPA 22.
The project was successfully delivered on schedule, within budget, and in full compliance with the approved specifications, strictly following the Fire Protection specialty Gantt chart and aligned with the client’s overall construction schedule.