Daltile

 

In this job, construction materials’ industrial plant type at Salamanca, Guanajuato, we installed the water storage process system as well as the fire protection water storage system.

The systems installed are integrated by three bolted tanks of 136,228 gallon capacity, each, that are dedicated (two of them) to storage water for the industrial day to day processes and (the third one) the storage of water supply for the fire protection system.

The project was delivered on time, quality and cost, fulfilling the GANT defined for each discipline and according to our client’s job program.