In this job, healthcare manufacturing plant at Apodaca, Nuevo Leon, we installed a water process system.

The system installed includes two bolted tanks of 26,194 gallons for reverse osmosis process.

The project included design, supply and installation of two tanks, as well as the disassembly of the former two fiberglass tanks.

The project was delivered on time, quality and cost, fulfilling GANT defined for the specialty and according to our client’s job program.