Sam’s Plaza Toros

In this project, carried out for a retail storage building in Querétaro, Querétaro, we installed the complete fire protection system.

The system included replacement of risers, as well as sprinkler protection in general offices, grocery areas, roof structures, and cold storage rooms, all designed in accordance with NFPA 13 standards. In addition, an indoor fire hydrant network with 1½” hoses and fire department Siamese connections was installed following NFPA 14. A 2,000 GPM fire pump system — including diesel, electric, and jockey pumps — was implemented according to NFPA 20.

Subsequently, maintenance was performed on the bolted fire protection water storage tank, with a capacity of 200,000 gallons, designed in compliance with NFPA 22. Finally, a fire alarm and detection system was installed in accordance with NFPA 72.

The project was completed on time, within scope and budget, strictly following the Fire Protection specialty Gant schedule and fully aligned with our client’s overall construction program.